Building Dimension 42m Long x 13M Wide x 23M high
The 300 Tonne steel structure was detailed and delivered in phases to suit the construction sequence and trade coordination.
With the Mecanical Equipment already in place, the top half of the 23 metre high structure was modularised into single lift modules and spliced to the lower structural steel.
EBJV shop detailing utilised the SMP models to locate Pipe Supports and Handrails as well as detect clashes between the Structural Steel and Mechanical / Piping Equipment.
Offering smart collaboration between disciplines - The design process was highly assisted with the use of EBJV's SMP 3D model.